TW gameicon.png KW gameicon.png
Advanced turbines
GDI Power plant upgraded with advanced turbines
GDI Power plant upgraded with advanced turbines
Upgrade
Affiliation

GDI icon test.png GDI
CNCKW ZOCOM Logo.png ZOCOM
CNCKW Steel Talons Logo.png Steel Talons

Research
Cost

$300

Build time

0:05

Requires

Tech Center (TW)
Command Post (KW)

Function
Hot key

Ctrl+A

Unlocks

Increases the power output of a Power Plant. Has to be purchased separately at each Power Plant.

CNCTW Advanced Turbines Cameo.png

Advanced turbines increase the power output of individual GDI power plants from 20 to 30. As opposed to the power turbine upgrade from the Second Tiberium War, turbines are placed in pairs instead of one at a time, and once purchased, they do not need to be placed individually.

Like its Nod and Scrin equivalents, it requires a Tech Center for this upgrade to be available. In Kane's Wrath, this upgrade only required a Command Post.

See also

Join the Global Defense Initiative! Global Defense Initiative Third Tiberium War Arsenal We save lives!
Community content is available under CC-BY-SA unless otherwise noted.